This article was last revised in 195 Days ago, some of its contents may have changed. If you have any questions, you can ask the author。

Pile Driven(Ramming) Ground Mounting is a economic and fast-way installation solutions. By using pile

driving machine hydraulically push galvanized steel posts into the ground to the required depth without 

using poured concrete to support a steel racking systems,it just takes some seconds to finish a piling 

pole. The racking is strong and cost-effective which adaptable to most terrains.

TECHNICAL INFORMATION
Install site:Open ground
Tilt Angle:6~50deg
System Height:<2.5m
Max Wind Speed:<60m/s
Snow Load:<1.4KN/㎡
Standard:AS/NZS 1170 and other international Standard
Material:Zin-Al-Mg or Hot galvanized steel
Anticorrosive: Hot galvanized
Color:Natural or Optional
Warranty:Ten years warranty and up twenty years service life

 

All mounting structural components are made of high class hot-galvanized Q235 or zin-mg-al steel and anodized aluminum components, their high resistance to corrosion and they are designed for twenty-year service life and backed by ten years warranty.

 

Pile Ramming Video (Demonstration):

There are just seconds to ram a pile,quite fast to install the solar farm!

 

 

We engineer and design Solar Racking/Mounting Hardware for specific solar projects, there may not list all the
details of racking in the web,therefore,please don't hesitate to contact us for more details for your specific projects.